VBA Sample - PERT Analysis
This macro restores the PERT macro removed from Project 2010. But wait, there's more! It also lets you change the PERT factors so you can have a 1:4:2 ratio so givinh more weight to the Pessimistic values as projects more easily lose time, than save it.
The macro also pre-fills all Optimistic, Most Likely and Pessimistic values using percentages you can change. So by default Optimistic values are 50% of the current Duration, Most Likely 100% and Pessimistic 200%. You can manually change the default values as required. Calculate PERT then calculates based on the factors you provide and stores the predicted value in a new column. Once happy another button click copies the PERT durations to the Duration column and stores the original values so they can be restored if needed.
Click Here to download a Project 2010 file with the macro in it.
Before opening the project file, make sure you enable VBA macros. To do this in Project 2010:
- Select File, Options, Trust Center
- In the Trust Center click the Trust Center settings button
- Select enable all macros. If your organization has one, you can
add a security certificate and then reduce the level of macro
security if wanted.
If you would like a custom version of the macro, or any other macro created for you then please contact us by clicking VBA Development
This macro is Copyright ACE Project Systems Ltd 2022.
Anyone is free to use this macro for personal use only and not sell
it on.
If there are problems with the macro, please email.
Enjoy!